MTB Trails at Smith Park, Brentwood, TNSmith Park Trail Extension
Give now
Dozens of volunteers with trail tools at a Smith Park workday

2.5 More Miles.

A new way in for every rider.

We are raising $30,000 to build 2.5 miles of new mountain bike trail at Smith Park in Brentwood. The City of Brentwood approved the route. The community is paying for it. A professional trail builder and volunteers will build it.

2.5New miles of trail
$30,000Community goal
$0City funds used

The trail

Around the outside. Into the back.

Map of Smith Park showing the new 2.5 mile trail in magenta and the existing trail network New 2.5 mile trail New way in Trails open today Hardscuffle Haul

The magenta line is the new route. The colored lines at lower left are the trails open today.

The new trail leaves the parking area by the hiking trailhead. It runs up the east side of the park, crosses the north end and drops into the back of the trail network.

A good portion already exists as an access trail used by park staff. That head start is why 2.5 miles costs $30,000.

New trail
2.5 miles
Total after the build
Around 10 miles
Approval
City of Brentwood
Funding
100% community
Where
Marcella Vivrette Smith Park, 1825 Wilson Pike

Why it matters

Today the way in is Hardscuffle Haul, the climb from the soccer fields. That climb keeps a lot of newer riders, younger kids and families from ever reaching the trails.

A second way in

Start near the hiking trailhead. Reach the back of the trails without the climb.

Every skill level

A first timer and a racer can enjoy the same park.

Around 10 miles

Today's network is about 7 miles. The extension adds 2.5 more.

A home course

Brentwood's middle and high school mountain bike teams train here.

Light on the land

Much of the route is an existing park access trail. Less new ground gets disturbed.

Built by neighbors

A professional trail builder and volunteers will build it together.

Freshly cut trail curving through the grass at Smith Park Volunteers lined up at a Smith Park trail workday

Trail work days

Grab a tool. Build the trail.

Money builds this trail. So do hands. A professional trail builder and volunteers will build the extension together. We will hold trail work days so you can help.

Hundreds of volunteers showed up to build the first 7 miles. We are doing it again. Work day dates are coming.

Sign up and we will reach out as soon as work day dates are set. Questions: Matt Robertson, 615.212.9314, robertson.mat@gmail.com

Volunteers raking and shaping trail at a Smith Park workday

$12,000 per mile. About $2.27 per foot.

What your gift builds

$2511 feet of trail
$10044 feet
$250110 feet
$500220 feet
$1,000440 feet
$2,5001,100 feet
$5,0002,200 feet
$12,000One full mile

Footage is the simple average of $30,000 across 13,200 feet. Actual cost per foot varies by terrain.

Giving levels

Pick your line

Every gift builds trail. Gifts of $1,000 or more join one of three societies named for Brentwood landmarks.

Ravenswood Society

$10,000 and up

Top placement on the trailhead donor sign. Private tour of the new trail. Recognition at a Brentwood City Commission meeting.

Inglehame Society

$5,000 to $9,999

Larger placement on the trailhead donor sign. Private tour of the new trail.

Oak Hall Society

$1,000 to $4,999

Name or logo on the trailhead donor sign. Listed on the Green Space Donor Wall.

Trail Builder

$250 to $999

Name on the online donor list.

Trail Friend

Up to $249

Our thanks and campaign updates.

The donor recognition sign at Marcella Vivrette Smith Park

Your name belongs here.

The donor sign at Smith Park honors the neighbors who built the first 7 miles.

Recognition for this campaign is proposed and pending sign off from the City of Brentwood and Citizens for Brentwood Green Space.

How to give

Citizens for Brentwood Green Space, a 501(c)(3), receives every donation. Gifts are tax deductible as the law allows.

Online

Give by PayPal or card through Brentwood Green Space. Pick the mountain bike project in the "Use this Donation for" dropdown so your gift goes to the trail.

Give now

Button not working? Use the Green Space donate page.

By check

Make it payable to:

Citizens for Brentwood Green Space, Inc.
1557 Copperstone Dr.
Brentwood TN 37027

Write "Mountain Bike Project" on the memo line.

Giving questions: info@brentwoodgreenspace.org

Trail talk

Is the city paying for any of this?

No. The City of Brentwood approved the route. The extension is 100% community funded.

Is my gift tax deductible?

Yes, as the law allows. Citizens for Brentwood Green Space is a 501(c)(3) and handles every donation.

Why only $30,000 for 2.5 miles?

A good portion of the route is an existing access trail used by park staff. We are improving and connecting it.

How do I direct my gift to the trail?

Pick the mountain bike project in the "Use this Donation for" dropdown. On a check, write it on the memo line.

Can I help build it?

Yes. A professional trail builder and volunteers will build it together at trail work days. Sign up to volunteer.